STEP 1 · TRIAGE
Find the right tender. Filter by fit.
Cithorum monitors eprocure.gov.in (the canonical Government of India tender portal, run by NIC) and aggregators like tender247.com. Daily filter on classification: Information Technology, Cloud / Data Centre, Storage Services. We bid where the workload, the EMD bracket, and the eligibility relaxations align.
- READY · eprocure.gov.in monitoring workflow
- READY · tender247.com daily triage
- READY · Karnataka 1,000 MW programme tracked (Suraj-led)
- READY · NIC channel via Suraj's network
STEP 2 · ELIGIBILITY
Check the gates. Apply the relaxations.
Most public-sector tenders demand: registered Indian entity, Tier-3 facility, three years of audited financials with ≥₹100 Cr turnover, ≥10 existing colocation customers (often with BFSI quota), ISO 27001 / SOC 2, and ownership/long-lease of the facility. Cithorum clears the technical gates and uses MSE preferences plus consortium-bidding to cover the credentials gap.
- READY · Tier-3 facility — 1 PB pod live via partner DC operator
- READY · Owner/lessee status — pod rights via partner
- READY · DPDP Act 2023 architecture + CERT-In logging
- READY · SOC 2 operational compliance (controls + monitoring)
- READY · ISO 27001 operationally compliant (full Annex A control mapping)
- FINALISING · Cithorum (India) Pvt Ltd — ROC incorporation Q2 2026
- FINALISING · Udyam-MSE registration → EMD exemption + 25% procurement preference
- FINALISING · SOC 2 Type I formal attestation (Q4 2026), Type II Q3 2027
- FINALISING · ISO 27001 formal certification (Q4 2026)
- POST-FORMATION · ≥₹100 Cr turnover gate — addressed via MSE relaxation OR consortium-bid prime
- POST-FORMATION · ≥10 colocation customers — addressed via consortium-bid prime credentials
STEP 3 · CONSORTIUM-BID (WHERE NEEDED)
Bring a Rittal-class SI. Cithorum brings the software layer.
For tenders where the prime-eligibility bar is too high for an MSE-stage Cithorum, the answer is consortium-bid: a Rittal-certified system integrator (i2k2 Networks, Inspira Enterprise, or similar) brings the prime credentials and the Rittal hardware build; Cithorum brings the Jam compression layer, the SOC 2 + ISO 27001 operational compliance, the SaaS layer, and the margin-on-software economics. Memo template + per-tender Engagement Letter mechanism is ready in the tender response toolkit.
- READY · SI Partnership Memo template (consortium-bid mechanics)
- READY · Per-tender Engagement Letter template (revenue split, scope)
- FINALISING · i2k2 Networks partnership conversation
- FINALISING · Rittal certified-SI relationship (via i2k2 or direct)
- POST-FORMATION · Signed MoU with at least one prime SI before first consortium bid
STEP 4 · RESPONSE SUBMISSION
Submit Cover A · Cover B · Cover C. Don't miss an annexure.
Public-sector tenders are submitted in three sealed envelopes (Cover A — Eligibility, Cover B — Technical, Cover C — Commercial), often in parallel with online submission via eprocure.gov.in. Every annexure must match the prescribed format exactly — wrong stamp paper, wrong signatory, wrong witness pattern, and the bid is rejected non-compliant.
- READY · Master tender response template (cover letter + executive summary + scope-of-work compliance + project plan + PERT)
- READY · No-Blacklist Self-Declaration template
- READY · Statement of No Deviations template
- READY · Mutual NDA template (₹100 stamp paper)
- READY · Pre-Contract Integrity Pact template
- READY · EMD Exemption Claim template (Udyam-MSE)
- READY · _placeholders.json (entity-wide search-and-replace lookup)
- FINALISING · Cithorum (India) letterhead with CIN, GST, address (post-incorporation)
- POST-FORMATION · Stamp paper inventory (₹100 non-judicial × 10+ sheets)
- POST-FORMATION · Two-witness pool (typically office staff or family with valid ID)
- POST-FORMATION · Authorised signatory list per Board Resolution
- POST-FORMATION · eprocure.gov.in vendor enrolment + TCIL credentials
STEP 5 · AWARD & PERFORMANCE
Letter of Acceptance. Performance Security. Onboarding.
Award triggers a 21-day window to furnish the Performance Security (typically 10% of contract value via Bank Guarantee) and counter-sign the contract. Onboarding then runs the customer-pilot playbook — site readiness in 6 weeks from PO, lift-and-shift in 3 weeks following acceptance.
- READY · 6-week site-readiness operational plan
- READY · 3-week lift-and-shift methodology
- READY · Monthly benchmark + restore-proof reporting
- READY · Named technical contact + SLA per tier
- POST-FORMATION · Bank Guarantee facility with a nationalised / scheduled bank for Performance Security issuance
- POST-FORMATION · Audited financial statements (parent-entity statements supplement Indian-entity readiness during early years)