Cithorum Futures investor deck
The current warm-investor PowerPoint deck: Jam today, Knowledge Graph tomorrow, proof in market, data-centre economics, founders, 1 PB pod, 100× rsync benchmark, and close.
RESOURCES
The Cithorum bundle: roadmap, technical specs, benchmark register, knowledge graph explainer, tender response toolkit, and unedited live-test footage. Open in browser, download individually, or grab the full set as a single ZIP.
01 — READING MATERIALS
Each PDF opens in a new tab so you can scan in-browser. DOCX versions are linked for editors.
The current warm-investor PowerPoint deck: Jam today, Knowledge Graph tomorrow, proof in market, data-centre economics, founders, 1 PB pod, 100× rsync benchmark, and close.
Sales / business-development deck for prospective Jam licensees: data-centre operators, OEM partners, ETL / log analytics / AI training pipelines, OEMs. Drop-in codec, 2–4 weeks to first benchmark on your data. ~50% below commercial cloud list rates.
The end-to-end investor plan. INR 1.25 Cr round, 1 PB proof environment, phased plan, unit economics, KG verticals, capital routes.
Full server, rack, network, power, cooling, redundancy spec for the 1 PB Cithorum Cloud build. Reference rig and supplier-grade detail.
Architecture, components, deployment paths, supported OS, SDK surface. The buyer-grade engineering reference for Jam Engine.
Plain-English walkthrough of the Jam protocol: compression model, restore path, metering, deployment topology. Pairs with the technical spec.
How the Knowledge Graph runs Cithorum's own 1 PB pod. Entities, edges, customer dashboards, restore proof, billing exports, audit slices. The first and current KG; the substrate every vertical KG inherits.
How the KG sits on Jam telemetry. Schema, entities, provenance, build order. Leads with Data-Centre Ops KG and closes with where the same core extends to vertical SaaS.
02 — SOURCE PROOF ARCHIVE
The two source-of-truth documents that back the proof wall. Public, diligence-ready, traceable.
Every claim on the proof wall mapped to its evidence source — invoice, programme letter, grant doc, partner email, test methodology.
Canonical list of named partners, programme memberships, grants, benchmarks, customer quotes. Public + diligence-ready.
03 — TENDER RESPONSE TOOLKIT
Reusable boilerplate for responding to Indian public-sector and enterprise tenders. Cover letter, executive summary, project plan + PERT chart, and the standard annexure set (No-Blacklist, No-Deviations, NDA, Pre-Integrity Pact, EMD exemption claim under the MSE policy). Edit the placeholders, sign on letterhead or stamp paper, file alongside the tender's prescribed format.
Cover letter, executive summary, technical write-up, project plan + PERT chart, eligibility annexure index. Mirrors the structure of public-sector RFPs in India.
Required by virtually every Indian public-sector tender. Print on Cithorum (India) letterhead, sign in blue ink, affix company seal.
Default no-deviations form (Variant 1) plus deviations form (Variant 2). Default to Variant 1 — public-sector procurement officers treat declared deviations as a flag.
Mutual confidentiality agreement. Print on ₹100 non-judicial stamp paper, two original copies, witnessed by two adult Indian residents.
Mandatory for most public-sector tenders. Two original copies on ₹100 (or prescribed) non-judicial stamp paper. Witnessed and signed in blue ink.
Claim of EMD and tender document fee exemption under the Public Procurement Policy for MSEs. Print on letterhead with the live Udyam Registration Certificate enclosed.
Single source of truth for entity-wide placeholders. Update once with confirmed values, then run search-and-replace per bid. Partial-fill format until Suraj confirms the legal-suffix details.
Index, workflow, and one-time operational checklist for the tender response toolkit (banking, stamp paper, witnesses, signatory list, certifications).
04 — FOOTAGE
Three derivatives of the same source recording. Use the summary cut for presentations, the loop for tile backgrounds, the full clip for diligence.
170-second annotated cut of the April 2026 live test. 135 GB VM snapshots → 17.2 GB combined. NVMe-bound encode + decode. Unedited monitor data.
8-second silent loop used in proof-tile autoplay slots. Ideal for embedding in slides or social posts.
Same source as the summary cut, full length. For diligence reviewers who want every frame of the encode + decode + restore verification.
Term sheet template, NDA, custom pilot scope, integration spec for a named workload — all available on request.